To change the order of files in an Airtable attachment field, expand the record and drag the files into the order you want. You can move a newer upload to the front or arrange photos in a particular sequence.

For a long list of numbered files, a script can sort them by name without dragging each one.

Dragging an attachment to the front of the file list

Rearrange attachments manually

Open your base in a browser or the desktop app, then expand the record containing the files. In the attachment field, drag a file to its new position and drop it. Repeat for the other files you want to move.

Reordering is available on all plans. You need permission to edit the attachment field.

Airtable documents these steps in its attachment field reference.

Can you reorder attachments in the mobile app?

Yes. In the iPhone app, open the record and drag the attachments into the order you want.

Sort attachments by file name

Dragging becomes slow when one record contains dozens of files. For numbered images such as Page 1.jpg, Page 2.jpg, and Page 10.jpg, use a script to put them in sequence.

The Scripting extension is available on paid plans in a browser or the desktop app. An Owner or Creator can add it through Tools > Extensions > Add an extension by searching for Scripting.

Open the extension, choose Start from scratch, and paste the code below. Wait until the files have finished uploading, then click Run and choose the table, attachment field, and record you want to sort.

const table = await input.tableAsync("Choose a table");
const field = await input.fieldAsync("Choose an attachment field", table);

if (field.type !== "multipleAttachments") {
  throw new Error("Choose an Attachment field.");
}

const record = await input.recordAsync("Choose a record", table);
if (!record) throw new Error("No record selected.");

const files = record.getCellValue(field) || [];
const ordered = [...files].sort((a, b) =>
  a.filename.localeCompare(b.filename, undefined, {
    numeric: true,
    sensitivity: "base"
  })
);

// Older fields can display attachments in reverse order.
if (field.options?.isReversed) ordered.reverse();

if (ordered.length > 1) {
  await table.updateRecordAsync(record.id, { [field.id]: ordered });
}
output.text("Done. The selected record's files are sorted by name.");

The numbered files will appear as Page 1.jpg, Page 2.jpg, then Page 10.jpg. This script changes only the record you select and keeps its existing attachments.

After adding more files, run the script again to sort them.